Display an Unattended Operation
When you select an operation sequence for an unattended operation in the Configured Product Inquiry (MBQ) program, these fields display:
|
Field Name |
Displays |
|
Operation code |
The code that identifies the operation for this sequence |
|
Work center no |
The work center where this operation is performed |
|
Operation type |
U: Unattended |
|
Machine number |
The machine in the work center on which this operation is performed |
|
Oper desc 1 - 4 |
The description of the process performed in this operation; this description prints on the shop paper |
|
Tool number |
The number of the tool that this operation uses |
|
Setup labor cd |
The setup labor code that represents the hourly labor rate required to set up this operation |
|
Std/Alt oper |
The operation sequence type: |
|
Dept number |
The number of the department where the operation takes place; prints on manufacturing orders |
|
Multiple setups? |
Selected: Multiple setups per manufacturing order Note |
|
Setup time |
The number of hours it takes to set up this operation |
|
Pieces per hour |
The number of output units processed in an hour |
|
Hours per piece |
The number of hours required to process an output unit |
|
Process UOM |
The unit of measure the current operation processes or produces, which may not be the unit of measure used for the final product |
|
UOM conversion |
The factor for converting the processing (input) units and hours to standard (output) units and hours. In the hole-punching operation example, if only one hole is punched at a time and there are 10 holes to punch, the conversion factor is 0.1; but if an operation punches all of the required holes in 10 pieces simultaneously, the conversion factor is 10.0. |
|
Op pieces per hour |
The number of pieces per hour output for the next operation: UOM conversion / Hours per piece |
|
Move time |
The number of shop days the manufacturing order spends in transit from this operation to the next |
|
Send ahead qty |
The quantity that you can send ahead to the next operation, splitting lots into a smaller quantity in order to begin the next operation before completing the current operation |
-
Choose the appropriate options:
|
To |
Do This |
|
Display notes for this operation |
Click Notes. See Display Notes. |
|
Exit this operation |
Click OK. |
|
Exit and return to the menu |
Click Quit. |
-
Choose the appropriate options when you click OK:
|
To |
Do This |
|
Display the selected operation sequence |
Click OK. |
|
Print the operation listing |
Click Print. See Print. |
|
Exit the operations |
Click Exit. |
|
Exit and return to the menu |
Click Quit. |
-
Choose the appropriate options when you click Exit:
|
To |
Do This |
|
Display the selected component |
Click OK. |
|
Print the component listing |
Click Print. See Print. |
|
Sort components by sequence number or part designator |
Click Sort options. Click a sort option or click Cancel to end this action. |
|
Exit this parent item |
Click Exit. |
|
Exit and return to the menu |
Click Quit. |
- Choose the appropriate options when you click Exit:
|
To |
Do This |
|
Display the selected record |
Click OK. |
|
Display the previous record in the file |
Click Prev. |
|
Display the next record in the file |
Click Next. |
|
Exit the program |
Click Exit. |