Display a Single Level of a BOM
Use the Single Level BOM Inquiry (MPI) program to display a single level of a bill of material entered with the Bill of Material Maintenance (MPS) program. See Road Map for work flow.
Enter data in these fields:
Field Name |
Type / Max Length |
Action / Description |
Parent item no |
Required |
Enter the item number that you want to display or click the Lookup icon and use the standard lookup options to select the item from a list. |
ECL |
Required/Display
only |
If the Display current ECL? program option is selected, the current ECL is displayed and cannot be changed. Enter the engineering change level for this parent item or leave
blank. |
These header fields are displayed:
Field Name |
Displays |
Parent item no |
The parent item number you entered or selected |
Eng drawing no |
The drawing number for this ECL |
Eng appr date |
The date when engineering approved this BOM |
ECL |
The engineering change level |
Desc |
followed by the approval status |
Bill audited date |
The date when this BOM was audited |
QA appr date |
The date when the quality assurance department approved this BOM |
Bill auditor |
The name of the person who audited this BOM |
Mfg appr date |
The date when manufacturing approved this BOM |
The components on the first level of the BOM are listed:
Field Name |
Displays |
||||||||
Sub |
Substituion code:
|
||||||||
Comp item no |
The number of the component |
||||||||
Description |
The description of the component |
||||||||
Part des |
The identifier your company uses to distinguish multiple occurrences of a component in the same bill of material |
||||||||
FS cd |
The floor stock
code of this component: |
||||||||
Qty per assy |
The quantity of this component required to build one parent |
||||||||
LT off |
The number of shop days after you release a manufacturing order that this component is required |
||||||||
Scrap % |
The percent of the component that you normally scrap during manufacturing |
||||||||
Stk UOM |
The stocking unit of measure |
||||||||
Type |
The code your company defined for component type |
||||||||
Byp cd |
The bypass code
for this component: |
||||||||
Ref cd |
The reference code for this component, entered in the Bill of Material Maintenance (MPS) program |
||||||||
Op seq |
The operation sequence number that identifies the order of operation in the manufacture of this component |
||||||||
M/B/K |
M:
Make the item |
||||||||
LLC |
The low-level code for this component |
||||||||
Effective |
The effective date for this component in the displayed bill |
||||||||
Expiration |
The expiration date for this component in the displayed bill |
||||||||
LT |
The component's
lead time: |
||||||||
Revised |
The date on which the item's bill of material was last revised |
||||||||
Comp ref |
The reference that your company uses for this component |
(Optional) Click Prog opts to review your options. To change them:
Click the Runtime tab to set runtime options. See Set Options for Reports and Inquiries for more information.
Click the Sort tab to set sort order.
Click the Program tab to set this program specific option:
Field Name |
Type / Max Length |
Action / Description |
Exclude items with expired eff dates? |
Optional |
Select to omit a component that has an expiration date before today or leave blank to display all components regardless of their effective dates. |
Display current ECL? |
Optional |
Select to default the display to the current ECL |
Click Save to save these options for future use.
Click OK to apply these options or click Cancel to exit without applying them.
(Optional) Select a component and click View subs. If one or more substitutes are set up for the item number, they are displayed. Click Exit to return to this program.
See Display Substitute Items for bill of material substitutions; see Item Substitution Inquiry there is an alternate inventory item that can be substituted for the component.
If the component has both inventory-level and bill of material-level substitutions, View subs enables you to see both.
Choose the appropriate options:
To |
Do This |
Review your options for this program |
Click Prog opts. See Set Options for Reports and Inquiries. |
Print the component listing |
Click Print. See Print an Inquiry. |
Display substitute items for the selected component |
Click View subs. See step 4. |
Display a bill of material for this subassembly |
Click Comp bill. Click OK to return to this display. |
Display the cost record for this item |
Click Item costs. See Display Item Costs. Click OK to return to this program. |
Display notes for the parent item |
Click Par notes. See Display Notes. |
Display notes for the selected component |
Click Comp notes. See Display Notes. |
Display a different bill |
Click OK. See step 1. |
Exit to the menu |
Click Exit. |