Road Map: Tool Crib Movement

Use the Tool Crib Movement (MTC) program to move tool inventory to an inventory location or a work center and machine. See Overview: Tool Tracking.

Before you run this program each time

You should run these programs: None required

Before you run this program the first time

  • System Options Maintenance (XM) (Manufacturing Options) to select the Use only inventory in work center loc option for your manufacturing branch.

  • Enterprise Item Maintenance (IM) to set up inventory tool crib items for your enterprise. Whse/Bin control? field must be active for order code 4 tool items.

  • Standard Operation Maintenance (ROM) to set up standard operations.

  • Routing Maintenance (RTM) to set up routings.

  • Work Center Maintenance (WCM) program to create work centers.

  • Tool Classification Maintenance (TICC) program to add classifications.

  • Tool Classification Type Maintenance (TICT) program to add classification types.

  • Tool Crib Maintenance (MTM) to add attributes to Order code 4 tool crib inventory items and associate a tool with a work center.

  • Output Device Maintenance (XDM) to set up the output devices that you plan to use.

  • Date-Output Device Maintenance (ZE) to select your default output device and set whether you can override that device.

  • Audit Trail Maintenance (XAT) to activate system logging of entries and changes.

After you run this program

You will most likely run these programs: Any