Road Map: Tool Crib Movement
Use the Tool Crib Movement (MTC) program to move tool inventory to an inventory location or a work center and machine. See Overview: Tool Tracking.
Before you run this program each time
You should run these programs: None required
Before you run this program the first time
-
System Options Maintenance (XM) (Manufacturing Options) to select the Use only inventory in work center loc option for your manufacturing branch.
-
Enterprise Item Maintenance (IM) to set up inventory tool crib items for your enterprise. Whse/Bin control? field must be active for order code 4 tool items.
-
Standard Operation Maintenance (ROM) to set up standard operations.
-
Routing Maintenance (RTM) to set up routings.
-
Work Center Maintenance (WCM) program to create work centers.
-
Tool Classification Maintenance (TICC) program to add classifications.
-
Tool Classification Type Maintenance (TICT) program to add classification types.
-
Tool Crib Maintenance (MTM) to add attributes to Order code 4 tool crib inventory items and associate a tool with a work center.
-
Output Device Maintenance (XDM) to set up the output devices that you plan to use.
-
Date-Output Device Maintenance (ZE) to select your default output device and set whether you can override that device.
-
Audit Trail Maintenance (XAT) to activate system logging of entries and changes.
After you run this program
You will most likely run these programs: Any