Display WIP Movement
When you click Movement in the WIP Order Inquiry (WIQ) program or the Work Center Operations (WCO) program, these fields display for operations entered in the WIP Movement (WIPM) or Labor Entry (LLE) program or imported with the Labor Import (LEI) program:
Field Name |
Displays |
Mfg order no |
The manufacturing order number that you entered or selected |
Work center no |
The number of the work center where the operation you selected is being performed |
Machine no |
The machine in the work center that performs the work |
Parent item no |
The number of the parent item on this manufacturing order |
Desc |
The description of the parent item |
Oper seq |
The operation sequence that you selected |
Oper cd |
The operation code for this sequence |
ECL |
The engineering change level for this manufacturing order |
RRL |
The routing revision level for this manufacturing order |
Last reported |
The last date on which activity was reported |
Finished |
The date this operation sequence was complete |
Qty ordered |
The quantity of this parent item to be built |
Qty received |
The quantity that has been received |
These details are displayed for each transaction:
Field Name |
Displays |
Seq no |
The sequence number for this work |
Good pieces |
The quantity of usable pieces produced with the total quantity of good pieces |
Scrap pieces |
The quantity of pieces produced that cannot be used with the total quantity of scrapped pieces |
Orig rem pcs |
Original remaining pieces: Qty ordered - Good pieces |
Direct hrs |
Standard hours
of direct labor for this operation: |
Setup hrs |
Standard hours to set up the machine or work center for this operation: Number of setups x Setup time |
Rework hrs |
The hours spent reworking pieces for this order |
Oth hrs |
Other hours: Labor hours that are not direct, setup, or rework |
Employee no |
The number of the employee that worked on this operation sequence |
Employee name |
The name of the employee number that worked on this operation sequence |
Date/time stamp |
The date and time this transaction was entered |
Dir lbr $ gd pcs |
The labor cost of the good pieces produced: (Good pieces x Pieces per hour) x Direct labor rate |
Dir lbr $ scr pcs |
The labor cost of the scrapped pieces: (Scrap pieces x Pieces per hour) x Direct labor rate |
Dir lbr rt |
Direct labor rate for this operation |
Batch |
The batch number assigned by the WIP Register (WIPR) program |
Choose these options:
To |
Do This |
Display scrapped material detail |
Highlight a line and click Comp scrap. See Display Scrap History Detail. |
Display rejected material detail |
Highlight a line and click Comp reject. See Display Scrap History Detail. |
Display good and scrap totals for the selected sequence |
Click Totals. Click Totals again to redisplay detail. |
Print the sequence listing |
Click Print. See Print an Inquiry. |
Exit this screen |
Click OK. See Display Work in Process Information. |
Exit the program |
Click Exit. |