Create a Rework Order
If you selected the Mfg rework/repair order disposition code, select operation sequences for the rework order.
The program displays these fields:
Field Name |
Displays |
Sel |
Selected:
This operation sequence is elected for this rework or repair order |
Oper seq |
The operation sequence number |
ST |
The type of operation: |
Oper cd |
The operation code |
Oper type |
The operation type: |
Wrk ctr |
The work center number |
Mach no |
The number of the machine used for this operation sequence |
Oper desc 1 |
The description of the process performed in this operation |
Click Sel to the left of the operation sequences you want to use for this rework order.
Choose the appropriate options:
To |
Do This |
Display all records or only selected records |
Click Selected/All. |
Select these operation sequences and continue processing this rework order |
Click OK. |
Select the components to pick for this rework order. The program displays these fields:
Field Name |
Displays |
Sel |
Selected:
This component is selected for this rework order |
Comp item no |
The number of the component |
Part des |
The identifier your company uses to distinguish multiple occurrences of a component in the same bill of material |
Qty per assy |
The quantity of this component required to make one parent item |
Qty selected |
The quantity selected for this rework order |
Click Sel to the left of the components needed for this rework order.
OR
Click a component (not Sel) to highlight it, click Modify, and enter the quantity you want to replace if it is less than the manufacturing order quantity.
OR
Click All to select all components for this order.
Choose the appropriate options:
To |
Do This |
Display all records or only selected records |
Click View. |
Select all components or clear all components |
Click All. |
Select these components and continue processing this rework order |
Click Exit. |
(Conditional) If you selected to rework a parent item or components that are serial, lot, or warehouse and bin controlled, select the control numbers for each controlled item this rework order.
The program displays these fields:
Field Name |
Displays |
Sel |
Selected:
This control number is selected for rework |
Control no |
The serial or lot control number of a component or parent item |
WH |
The warehouse location of a component or parent item |
Location |
The bin location of a component or parent item |
Available |
The quantity of a component or parent item available for selection |
Click Sel to the left of the control number or location of the component or parent item you want to use for the rework manufacturing order. Click Sel again to clear the selection.
OR
Click a line (not Sel) to highlight it, click Modify, and enter the quantity you want to rework if it is less than the manufacturing order quantity.
Choose the appropriate options:
To |
Do This |
Display all records or only selected records |
Click Selected/All. |
Select a range of control numbers |
Click Range. The program prompts Enter beginning control no and Ending control no.
|
Pick the selected control numbers |
Click Exit. |
The program displays the Rework order [number] has been created.
Click OK. See Disposition Rejected Material.