Create an Indirect Operation
When you click Operations in the Routing Maintenance (RTM) program and select an indirect operation type, you can create a new indirect operation, change, or delete it.
Enter data in these fields:
Field Name |
Type / Max Length |
Action / Description |
Operation code |
Required |
Accept the displayed code or change the code if the new code is the same type as the original code (I = indirect). |
Machine number |
Required |
Accept the displayed machine number for this work center or click the Lookup icon and use the standard lookup options to select the machine from a list. The work center and machine number combination identifies a specific work location. |
Oper desc 1 - 4 |
Optional |
Accept the displayed description of this operation or enter a one- to four-line text description of the process performed in this operation. This description prints on the shop paper. |
Indirect labor cd |
Optional |
Accept the displayed code that represents the hourly labor rate for this operation or select a different code. |
Std/Alt oper |
Required |
Select S if this operation is standard or select A if you expect to use it occasionally. Click Chg oper in the Manufacturing Order Maintenance (MIM) program when you release an order to select an alternate operation in addition to or in place of a standard operation. You have the option to recalculate standard labor cost based on the alternate operations you select. Alternatively, click Alternate in the WIP Movement (WIPM) program. This method adds the selected alternate operations to actual labor cost but does not recalculate standard labor cost. |
Overhead rate total |
Display only |
Sum of the overhead rates (based on the four overhead codes in the work center record) |
Dept number |
Optional |
Accept the displayed department where the operation takes place or select a different department. The default comes from the work center's record in the Work Center Maintenance (WCM) program. Department prints on shop paper. |
Mfg branch |
Optional |
Accept the displayed manufacturing branch where the operation takes place, select a different branch, or leave blank. |
Move time |
Optional |
Enter the number of shop days the manufacturing order spends intransit from one operation to the next. Capacity planning and priority dispatch programs and the Accumulated Lead Time Calculation (MLT) program use this field. |
Send ahead qty |
Optional |
Enter the quantity that you can send ahead to the next operation, splitting lots into a smaller quantity in order to begin the next operation before completing the current operation. Capacity planning programs use send ahead quantity when calculating load. |
Choose the appropriate options:
To |
Do This |
Change a field |
Click Modify. |
Delete a saved record |
Click Delete. See Delete. |
Exit without creating this operation |
Click Cancel. |
Change the Work center no field |
Click Other info and then Modify. |
Enter notes for this operation |
Click Notes. See Enter Notes. |
Go to a related program |
Click Jump. See Jump. |
Display the standard indirect operation |
Click Std operation. See Create a Standard Indirect Operation. Click OK to return to this program. |
Associate a tool with this operation |
Click Tools. See Associate a Tool with an Operation Sequence. |
Display changes to this operation |
Click Audit..
See Display an Audit Trail.
Click Exit to return to
this program. |
Accept the data |
Click OK. The program prompts Operation seq no. Enter another sequence or leave blank to exit. |