Maintain an Item's Plan
Use the Planning Profile Maintenance (MPM) program to enter a planned order, change the quantity ordered, move the due date, and break a planned order into multiple orders. See Background and Road Map for more information.
Enter the item number or click the Lookup icon and use the standard lookup options to select the item from a list.
The program displays these fields:
Note
Displayed values are for the user logon manufacturing branch when applicable.
Field Name |
Displays |
||||
Item no |
The item number you entered or selected followed by its description |
||||
Item type |
The type assigned to this item in the Enterprise Item Maintenance (IM) program; see Item Types |
||||
Prod class |
The product class assigned to this item in the Enterprise Item Maintenance (IM) program |
||||
Planner |
The code of the planner for this item, entered in the Planner field in the Branch Item Maintenance (IMB) program |
||||
Consignment |
N:
Item is not on consignment |
||||
RRL |
The routing revision level entered in the Routing rev lvl field in this item's record in the Branch Item Maintenance (IMB) program |
||||
Stk UOM |
The item's stocking unit of measure entered in the Stocking UOM field in the Enterprise Item Maintenance (IM) program |
||||
Auto plan |
|
||||
Planning period |
The planning period code either from the Branch Item Maintenance (IMB) program or from this program |
||||
Scrap % |
The percent of this item that you normally scrap during the manufacturing process, which is entered in the Scrap % field in the Branch Item Maintenance (IMB) program |
||||
Max days |
The total number of days of sales orders for each planned order, which is entered in the Max plan period field in the Branch Item Maintenance (IMB) program The Finished Goods Planning (MFP) and Material Requirements Planning (MRP) programs use this number to schedule planned orders. |
||||
Lead time |
The total number of days needed to procure or manufacture this item For purchased items (Make/Buy/Kit = B): Order prep LT + Intransit LT + Put-away LT For manufactured or kitted items (Make/Buy/Kit = M or K): Order prep LT + Mfg LT + Put-away LT |
||||
Accm lead |
The item's accumulated lead time |
||||
Safety stock |
The minimum quantity of this item to be kept in the stockroom at all times; entered in the Safety stock field in the Branch Item Maintenance (IMB) program |
||||
Min order |
The minimum quantity
for a planned order; entered in the Min
order qty field in the Branch Item Maintenance (IMB) program |
||||
Lot size |
The standard quantity of the item manufactured at a time; entered in the Lot size field in the item's record in the Branch Item Maintenance (IMB) program The Finished Goods Planning (MFP) and Material Requirements Planning (MRP) programs use lot size when creating planned orders. |
||||
OH+ Flr stk |
The quantity of this item in on hand and floor stock inventory in branches in your inventory group |
||||
In MRB |
The quantity tagged as rejected material |
The program displays these fields for each period:
Field Name |
Displays |
Date |
The start date of each period; period 1 has no start date; period 2 is your login date or if that date is not on the shop calendar, the preceding work day. The Planning period field in the item's record in the Branch Item Maintenance (IMB) program determines the period length. ** indicates the end of the demand time fence:
|
Sales |
The quantity of this item committed for sales orders that have not been shipped in this period |
Forecast |
The quantity forecast for this period; 0 for some periods if you did not select the Spread forecast field in the item's record in the Branch Item Maintenance (IMB) program |
Other req |
Other requirements, which may be generated from a parent item, outgoing transfers, planned orders, or safety stock |
Other sup |
Other supply, which includes the quantity on hand, purchase orders, requisitions, incoming transfers, and released manufacturing orders |
Planned |
The quantity on orders planned by the system for the period |
Proj on hand |
Based on all sources of demand and supply for the period, the projected on hand quantity at the end of the period Period 1 is calculated: Other sup - Other req - Sales - Forecast Subsequent periods are calculated: |
ATP |
Available To Promise, which is a calculation of the "for sale" quantity of an item by planning period The Finished Goods Planning (MFP) and Material Requirements Planning (MRP) programs calculate ATP for each finished good and selected components of configured products. If you add, change, or delete planned orders for an item, the program recalculates ATP. When an operator enters a sales order line, ATP determines whether there is sufficient supply to promise the customer delivery by the date wanted. |
Days |
The number of shop days in the period |
Per |
The period number: 1 to 50 |
Totals for Sales, Forecast, Other req, Other sup, and Planned display after the last period.
(Optional) Click Prog opts to review your options. To change them:
Click the Runtime tab to set runtime options. See Set Options for Reports and Inquiries for more information.
Click the Program tab to set this program specific option:
Field Name |
Type / Max Length |
Action / Description |
Enter planning period |
Optional |
Select to display a specific planning period or a planning period set up in the Branch Item Maintenance (IMB) program. |
Click Save to save this option for future use.
Click OK to apply this option or click Cancel to exit without applying it.
Choose the appropriate options:
To |
Do This |
Review your options for this program |
Click Prog opts. See step 2. |
Print the planning profile |
Click Print. See Print an Inquiry. |
Change the quantity, move the due date, or break a planned order into multiple orders |
Click Update. See Add a Planned Order. |
Display all sources of demand for this item |
Click Peg demand. See Display Demand Sources. Click OK to return to this program. |
Display all sources of supply of this item |
Click Peg supply. See Display Supply Sources. Click OK to return to this program. |
Specify a different item |
Click OK. |
Exit the program |
Click Exit. |