Add a Planned Order
Use the Planned Order Maintenance (MOP) program to add or change, break, move, copy, and delete a planned order. See Background and Road Map for more information.
Enter the item number you want to add a the planned order for or click the Lookup icon and use the standard lookup options to select the item from a list.
These fields are displayed in the header:
Field Name |
Displays |
Mfg branch |
The manufacturing branch |
Item number |
The entered item number followed its description |
Item type |
The type assigned to this item in the Enterprise Item Maintenance (IM) program; see Item Types |
Prod cl |
The product class for this item |
Planner |
The code of the planner who plans this item |
Consignment |
Y indicates a consignment item |
RRL |
The item's routing revision level |
Stock UOM |
The item's stocking unit of measure |
Auto plan |
Y:
The Auto planning? field
is selected in the Branch Item Maintenance (IMB) program |
Planning period |
This item's planning period code (assigned in the Branch Item Maintenance (IMB) program) |
Scrap % |
The percent of this item that you normally scrap during the manufacturing process, which is entered in the Scrap % field in the Branch Item Maintenance (IMB) program |
Max days |
The number of shop days to be covered by a single order |
Lead time |
The number of shop days of lead time for this item |
Accm lead |
The item's accumulated lead time |
Safety stock |
The minimum quantity of this item to be kept in the stockroom at all times |
Min order |
The minimum quantity of this item that can be ordered on a planned order |
Lot size |
The standard quantity of this item that you manufacture during the production process |
OH + Flr stk |
The quantity on-hand plus floor stock inventory |
In MRB |
The quantity tagged as rejected material |
Existing planned orders for the item are listed:
Field Name |
Displays |
ECL |
The engineering change level of the ordered item |
Due |
The date the planned order is due |
Qty ordered |
The quantity of the planned order |
RRL |
The routing revision level of the ordered item |
Choose the appropriate options:
To |
Do This |
Add a planned order |
Click Add. |
Delete the a planned order |
Highlight the line and click Delete. See Delete. |
Copy the a planned order |
Highlight the line and click Copy. See Copy. |
Display a planned order |
Highlight the line and click Select or double click the line. |
Print the planned order list |
Click Print. See Print. |
Break an order into multiple orders |
Highlight the line and click Break. See Break a Planned Order Into Multiple Orders. |
Move the date of an existing planned order and change the quantity |
Highlight the line and click Move. See Move the Date of a Planned Order. |
Change the Mfg order firm field for an order |
Highlight the line and click Firm. |
Delete all planned orders from the selected record to the end of the record (all dates greater or equal to the selected due date) |
Highlight the line and click Clear. |
Specify a different item |
Click OK. |
Exit the program |
Click Exit. |
Enter or change data in the following fields:
Field Name |
Type / Max Length |
Action / Description |
Mfg branch |
Display only |
The manufacturing branch |
Item number |
Display only |
The selected item number |
ECL |
Optional |
Accept the displayed engineering change level or enter a different ECL. The default is the Current ECL for the item (in Branch Item Maintenance). |
Due date |
Required |
Select the due date for this planned order or enter a date shortcut. The due date must be on the shop calendar and cannot be beyond the product's end-of-life date selected in the Enterprise Item Maintenance (IM) program. Note |
Mfg order firm |
Optional |
Select F Firm if this order is firm or leave blank if you want the planning system to cancel or reschedule this order based on demand. |
Start date |
Required |
Accept the displayed start date, select a different date, or enter a date shortcut. The start date must be a work date on the shop calendar. If you selected M or K in the Make/Buy/Kit field for your item in the Item Maintenance (IM) program, the calculated start date is: Due date - (Manufacturing LT + Order prep LT + Put-away LT) If you selected B in the Make/Buy/Kit field for your item, the calculated start date is: Due date - (Order prep LT + Intransit LT + Put-away LT). |
Qty ordered |
Required |
Enter the quantity for this order. |
Routing rev lvl |
Optional |
Accept the displayed routing revision level or enter a different RRL The default is from the Current RRL field in the item's record in the Branch Item Maintenance (IMB) program. |
Choose the appropriate options:
To |
Do This |
Display a planned order |
Highlight the line and click Select or double-click the line. |
Change a field |
Move the cursor to the field and make the change |
Save changes and leave current record displayed |
Click Apply. |
Run another program for this item |
Click Jump. See Jump. |
Delete a saved record |
Click Delete. |
Exit without adding this planned order |
Click Cancel. |
Enter notes for this planned order |
Click Notes. See Enter Notes. |
Create multiple planned orders from this planned order |
Click Multi orders. See Create Multiple Planned Orders. |
Accept the data |
Click OK. If you added an order, the program prompts for ECL. If you changed an order, the program returns to the list of planned orders. See step 2. |
Exit the program |
Click Exit. |