Create an Outside Service Operation
When you click Operations in the Routing Maintenance (RTM) program and select an outside service operation type, you enter and change details about work you send out.
Enter data in these fields:
Note
A number of the displayed fields are not active for outside service operations.
Field Name |
Type / Max Length |
Action / Description |
Operation code |
Required |
Accept the displayed code or change the code if the new code is the same type as the original code (P = outside service). |
Work center no |
Display only |
Defaults to Vendor for outside services |
Vendor number |
Required |
Accept the displayed vendor number, enter a different vendor, or click the Lookup icon and use the standard lookup options to select the vendor from a list. |
Oper desc 1 - 4 |
Optional |
Accept the displayed description of this operation or enter a one- to four-line text description of the process performed in this operation. This description prints on the shop paper. Note |
Cost per piece |
Optional |
Enter the cost that the vendor charges to perform this operation. Manufacturing cost reporting programs use this field to calculate the standard cost for this purchased service and receiving programs use it as a default cost for a purchased service. |
Std/Alt oper |
Required |
Select S if this operation is standard or select A if you expect to use it occasionally. Click Chg oper in the Manufacturing Order Maintenance (MIM) program when you release an order to select an alternate operation in addition to or in place of a standard operation. You have the option to recalculate standard labor cost based on the alternate operations you select. Alternatively, click Alternate in the WIP Movement (WIPM) program. This method adds the selected alternate operations to actual labor cost but does not recalculate standard labor cost. |
Move time |
Optional |
Enter the number of days needed for the manufacturing order to be ready for the next operation. For outside services, this is the total time that elapses from shipping the work to the vendor to receiving the completed work back from the vendor. Release Outside Services (WOS) calculates the purchase order date wanted and date promised as the system date plus the number of days you enter. If do not enter a move time (i.e., it is zero), wanted and promised dates default to one day after the PO is released. Capacity planning, priority dispatch and the Accumulated Lead Time Calculation (MLT) program use this field. |
Send ahead qty |
Optional |
Enter the quantity that you can send ahead to the next operation, splitting lots into a smaller quantity in order to begin the next operation before completing the current operation. Capacity planning programs use send ahead quantity when calculating load. |
Choose the appropriate options:
To |
Do This |
Change a field |
Move the cursor to the field and make changes. Click Apply to accept changes or click Cancel to reject changes. |
Delete a saved record |
Click Delete. See Delete. |
Enter notes for this operation |
Click Notes. See Enter Notes. |
Go to a related program |
Click Jump. See Jump. |
Display the standard purchased service operation |
Click Std operation. See Create a Standard Purchased Service Operation. Click OK to return to this program. |
Associate a tool with this operation |
Click Tools. See Associate a Tool with an Operation Sequence. |
Display changes to this operation |
Click Audit..
See Display an Audit Trail.
Click OK to return to
this program. |
Accept the data |
Click OK. The program prompts Operation seq no. Enter another sequence or leave blank to exit. |