Use the Routing Inquiry (RTQ) program to display a routing revision level for a parent item. See Road Map for work flow.

  1. Enter the parent item number whose routing you want to display and click OK. The description and other information about the item is displayed.

OR

Click the Lookup icon and use the standard lookup options to select the parent item and routing revision level from a list. The description and other information about the item is displayed. Skip step 2.

  1. Select a routing revision level and click Select.

The program displays these fields:

Field Name

Displays

Date added

The date that you entered this routing revision level

Date changed

The date that you changed this routing revision level

Customer number

The customer's number, if this item is manufactured primarily for a single customer

Cust item no

The customer's item number for this item

Customer reference

The customer's name, if this item is manufactured primarily for a single customer

Material

The code or abbreviation for the primary material used in making this item

Material desc

The description of the primary material in the Material field

Std lot size

The standard quantity of the item that you make at one time during the production process

If you select the Calculate labor and overhead? field in the Standard Cost Rollup (MCR) program, this field determines the incremental setup labor cost per unit.

Avg lot size

The average quantity of the item that you make during the production process

Max order qty

The maximum quantity for a single manufacturing order

You can override this maximum in the Manufacturing Order Maintenance (MIM) or Planned Order Maintenance (MOP) programs.

The Order Release Selection (MRR) program uses this order maximum when releasing planned manufacturing orders. For example, if the planned order is for 100 units and the maximum order quantity is 50 units, MRR includes 2 entries for 50 units each. The planned order is reduced as the manufacturing order(s) are released.  When the planned order reaches zero the record is deleted.

Rough weight

The estimated weight of a single item, a standard lot, or the raw materials

UOM

The processing unit of measure for this item

The program also displays accumulated standard hours:

Field Name

Displays

Run/Unit

The total hours per piece for all operations for this item

Run/Lot

The total hours per lot: Run per unit x Std lot size

Setup/Lot

The number of hours for all setups

Total/Lot

The total hours to setup and manufacture one standard lot of this parent item: Run per Lot + Setup

  1. Click Operations. The program displays these fields:

Field Name

Displays

Seq

The operation sequence number

Oper cd

The code for the operation associated with this sequence

Std/Alt

The operation sequence type:
S
: Standard
A
: Alternate

Type

Operation type:
B
: Batch
I
: Indirect
P
: Purchased service
R
: Regular
U
: Unattended

Wrk ctr

The work center where this operation is performed

Mach no

The number of the machine used in this work center

Oper desc 1

The description of the process performed in this operation

Setup

The number of hours it takes to set up this operation

Hrs/Pc

The number of hours required to process an output unit or batch

Pcs/Hr

The number of output units processed in an hour or batch

Move time

The number of shop days the manufacturing order spends intransit from this operation to the next

Cost per piece

The cost per piece (only applicable to purchased service operations)

  1. Select an operation sequence and click Select.

For operation type

See

R for regular

Display a Regular Operation

B for batch

Display a Batch Operation

I for indirect

Display an Indirect Operation

P for purchased service

Display a Purchased Service Operation

U for unattended

Display an Unattended Operation