Enter or Change a Manufacturing Order
Use the Manufacturing Order Maintenance (MIM) program to enter, change or close regular manufacturing and rework and repair orders. See Background and Road Map for more information.
Field Name |
Type / Max Length |
Action / Description |
Mfg branch |
Display only |
The manufacturing branch, followed by its description |
Mfg order no |
Required |
Click
New or enter NEW
or # if you want the system
to assign the next available number. Use the Numbering
System Setup (XOC) program to set up a manufacturing order
number scheme. The order and approval status is displayed below the manufacturing order number; additional information This field cannot be changed after the manufacturing order is created. |
Parent item no |
Required |
Enter
the parent item or click the Lookup icon and use the standard
lookup options to select the item from a list. When you Enter
or click Other info, the item's description,
minimum order quantity, lot size, manufacturing lead time, warehouse/bin
location, serial/lot control and pre-assign control number flags
are displayed for information. |
Description |
Display only |
The parent item's description |
Qty ordered |
Required |
Enter a quantity that you want to manufacture. Note |
Qty scrapped |
Display only |
The quantity scrapped against this order |
Qty received |
Display only |
The quantity received against this order |
Qty rejected |
Display only |
The quantity rejected Note |
Qty stocked |
Display only |
The quantity received to stock Note |
Order type |
Required |
Accept R
for a regular manufacturing order, select P
for repair, or W for rework.
If you select P or W, see Enter a Rework
or Repair Manufacturing Order. |
Inspection? |
Optional |
Accept the inspection selection, select to inspect the order; or leave blank if you do not want inspection. You cannot de-select the field if the item requires inspection. |
Date released |
Display only |
The date the manufacturing order was created |
Original due date |
Display only |
The initial due date associated with the manufacturing order |
Due date |
Required |
Accept the displayed date, select a different date that this order is due to be completed, or enter a date shortcut. The date you select must be on the shop calendar. The program calculates the displayed date: Date released + Mfg LT |
Date picked |
Display only |
The date the manufacturing order was picked (i.e., the first time something was picked against the order) |
Last activity date |
Display only |
The most recent date on which activity was associated with the manufacturing order |
Date completed |
Display only |
The date the manufacturing order was completed |
Date closed short |
Display only |
The date the manufacturing order was closed short |
Date closed |
Display only |
The date the manufacturing order was closed |
Job close date |
Display only |
The date the manufacturing order was processed by Manufacturing Order Close (MJC). |
ECL |
Required |
Accept the Engineering
Change Level entered in the Current
ECL field of this item's record in the Branch Item Maintenance
(IMB) program or enter a different ECL.If your entry does not
match a BOM, the program prompts There
is no Bill of Material for this ECL; continue? Click Yes to create the order or click
No to change your entry. |
Added by |
Display only |
The user that created the order |
RRL |
Optional |
Accept the routing revision level entered in the Current RRL field in this item's record in the Branch Item Maintenance (IMB) program, enter a different RRL, or clear the field (blank). |
Stocking UOM |
Display only |
The parent item's stocking unit of measure is displayed |
Firm |
Optional |
Select F if the due date for this order is firm or leave blank if you want the planning system to be able to reschedule or cancel this order. |
Priority |
Optional |
Accept the displayed priority set in the demand order, enter a different priority, or leave blank. If you leave blank, the Manufacturing Order Picking Selection (MSS) program displays 999. See Background for more information. |
Stocking branch |
Optional |
Select a stocking branch if it is different from the manufacturing branch. The field defaults to the value set in Branch Item Maintenance (IMB). |
Demand order type |
Display only |
The first demand order type associated with the manufacturing order |
Demand order number |
Display only |
The first order number associated with the manufacturing order |
Demand order line |
Display only |
The first order line number associated with the manufacturing order |
Customer name |
Display only |
The name of the customer that ordered the item if the demand order is a sales order |
Sales order demand |
Optional |
Accept the sales order number associated with this manufacturing order or enter a different one. Your entry is not validated; you can enter a reference or change a reference generated by the order release process. |
S/O line |
Optional |
Accept the sales order line number associated with this manufacturing order or enter a different one. Your entry is not validated; you can enter a reference or change a reference generated by the order release process. |
Reason date chgd |
Conditional |
Select a code that explains why you changed the Due date for an existing manufacturing order. |
Last picking no |
Display only |
The last picking number assigned to the manufacturing order |
Notify rcpt |
Optional |
Select a user ID to whom an email notification is sent on receipt of the manufacturing order. |
Choose the appropriate options:
Note
Depending on the type of order and its status, not all buttons described below may be available.
To |
Do This |
Change a field |
Move the cursor to the field and make changes. Click Apply to accept the changes or click Cancel to reject the changes. |
Delete the manufacturing order |
Click Delete. A manufacturing order can be deleted only if it is not referenced elsewhere (e.g., as supply) and no material or labor transactions have been made against it. |
Enter notes |
Click Notes. See Enter Notes. A green check mark is displayed on the Notes button if notes exist for the displayed manufacturing order. |
Enter or change data in custom fields your company uses |
Click User. See Enter Data in User and Shadow File Fields. This button is active only if you have set up user fields for this program in the User Fields Maintenance (XMO) program. |
Go to a related program |
Click Jump. See Jump. |
Display the changes made to this order |
Click Audit.
See Display an Audit Trail.
Click OK after you view
the audit trail to return to this program. |
Close this order |
Click Close order. See Close a Manufacturing Order. |
Assign components to this manufacturing order |
Click Obligate.
See Obligate
a Manufacturing Order. |
Print shop paper for this manufacturing order |
Click Shop paper. See Print or Reprint Documents. |
Add a component, change component quantities, pick selected components, substitute components, or close components short |
Click Component. See Add a Component to a Manufacturing Order, Change Component Quantities for a Manufacturing Order, Pick Selected Components, Substitute Components, or Close all Open Components. |
Create a link to a demand order or display the linked demand order |
Click Demand. See Display Links to Demand Orders. Click OK to return to this program. This button is active only if you selected Link mfg orders to demand in MIM? in System Options Maintenance (XM) - Manufacturing Options. |
Display work in process information for this order |
Click WIP status. See Display Work in Process Information. Click OK to return to this program. This button is active after you release the order. |
Display the supply order for this manufacturing order |
Click Supply. See Display the Supply Order. Click OK to return to this program. This button is active only if this order has an associated purchase order or requisition. |
Display tool numbers and usage information |
Click Tools.
See Display Tools Associated with a Parent
Item. Click OK to
return to this program. |
Select an alternate routing |
Click Chg oper. See Select Alternate Operation Sequences. |
Display serial or lot control numbers on an order |
Click Ctrl
info. See Controlled Item
Tracking or Display Pre-Assigned Control
Numbers. Click OK to
return to this program. |
Display receivers for this manufacturing order |
Click Receiver. See Display Receivers for Orders. Click OK to return to this program. |
Display disposition of rejected material |
Click MRB.
See Display Rejected Items. Click
OK to return to this program. |
Display a pending ECO for this item |
Click ECO. See Display Engineering Change Orders by Item. Click OK to return to this program. |
View or import documents associated with the manufacturing order |
Click Documents.
See Document Archiving and Document Import for more information. |
Change the parent item |
Click Chg item. The Chg item button is only visible if your system allows the parent item to be changed. See the Allow parent item change in MIM option in System Options Maintenance - Manufacturing Options. |
Release the order or specify a different manufacturing order |
Click OK. If this is a new manufacturing order, it is released. If the ordered item requires control numbers to be assigned, enter the first lot or serial number you want to assign or leave blank to have the program assign numbers using the numbering system set up in System Options Maintenance - Control Number Options. See Enter Control Information or Manually Select Control Numbers. |
Exit the program |
Click Exit. |