Display Work Centers
Use the Work Center Inquiry (WCQ) program to display work centers. See Road Map for work flow.
If you displayed this screen from another program, go to step 1.
The program displays these fields:
Field Name |
Displays |
Work ctr |
The work center number; VENDOR for an outside service |
Mach no |
The machine number at this work center; vendor number for an outside service |
Dept no |
The department number responsible for this work center |
Description |
The description of the operation that takes place at this work center; the vendor's name for an outside service |
Mach cap |
The number of hours per day this machine is available for productive use at this work center |
Shfs |
The number of shifts per day |
Wkrs |
The number of people who operate this work center per shift |
Queue |
The number of shop days a job generally spends in a queue before being processed |
Field Name |
Displays |
Work center no |
The number of the work center you selected; VENDOR for an outside service |
Machine number |
The machine number for this work center; the vendor number for an outside service |
Description |
The description of the operation that takes place at this work center; the vendor's name for an outside service |
Dept number |
The department responsible for this work center |
Mfg branch |
The manufacturing branch for this work center |
Critical? |
Selected:
This work center is critical |
Picking warehouse |
If you selected the Backflush components by operation seq? and Use only inventory in work center loc? options for your manufacturing branch in the System Options Maintenance (XM) program (Manufacturing Options), the warehouse from which the system picks components |
Picking bin |
If you selected the Backflush components by operation seq? and Use only inventory in work center loc? options for your manufacturing branch in the System Options Maintenance (XM) program (Manufacturing Options), the bin location from which the system picks components; if blank, backflush components from any available bin |
Machine lbr cd |
The labor rate code and rate for an unattended operation; if blank, the system uses the Setup labor cd in the unattended operation's record in the Routing Maintenance (RTM) program |
Overhead code 1 - 4 |
Four overhead rate codes and rates that apply to this work center but not to an outside service |
Mach capacity |
The number of hours per shop day this machine is available for productive use at this work center |
Mach util % |
The percent of time that the machine is use |
Labor capacity |
The number of hours per shop day that workers are at this work center |
Labor util % |
The percent of time workers at this work center are actually performing setup or direct labor; maintenance and cleaning are usually excluded from the utilization percent |
Labor eff % |
The labor efficiency
percent: (Hours per piece x
Pieces produced) / Hours spent on production) x 100 |
Workers |
The number of employees who operate this work center per shift; this number does not affect labor capacity |
Shifts |
The number of shifts per shop day for this work center |
Queue time |
The number of shop days a job generally spends in a queue before being processed |
Hours shift 1 - 3 avl |
For future use |
Downtime allowed? |
For future use |
Stocking warehouse |
Enter the warehouse where items controlled by location are stocked if you are using the "stock at last operation" feature (selected by item in Branch Item Maintenance) and the item is warehouse/bin controlled. |
Stocking bin |
Enter the bin where items controlled by location are stocked if you are using the "stock at last operation" feature (selected by item in Branch Item Maintenance) and the item is warehouse/bin controlled. |
Choose the appropriate options:
To |
Do This |
Exit this work center |
Click OK. |
Display notes for this work center |
Click Notes. See Display Notes. |
Display data in custom fields your company uses |
Click User. Note |
Display utilization exceptions |
Click Utilization. See Enter Utilization Exceptions. When utilization exceptions exist, a green check mark appears on the Utilitzation button. |
Display tool availability |
Click Tools. See Display Tools Associated with a Parent Item. |
Exit and return to the menu |
Click Quit. |
Choose the appropriate options when you click OK:
To |
Do This |
Display the selected work center |
Click Select. |
Print the work center listing |
Click Print. See Print. |
Sort the listing by department, description, or machine number |
Click Sort Options. Click a sort order or click Cancel to end this action. |
Exit the program |
Click Exit or Quit. |