Display WIP Costs

Use the WIP Cost Inquiry (WICQ) program to display work in process labor, overhead, setup, outside service, and other costs for a manufacturing order. See Road Map for work flow.

  1. Enter the number of the manufacturing order or click Lookup and use the standard lookup options to select the order from a list.

    The program displays information about the manufacturing order:

Field Name

Displays

Mfg order no

The manufacturing order number that you entered or selected followed by its status:

Complete

The order quantity has been received into on-hand inventory

Closed by user

User clicked Close order in the Manufacturing Maintenance (MIM) program

Closed by rcv

Received less than quantity ordered and clicked Close order? in the Receiver Maintenance (IRC) program

In picking

Some components have been picked

Open

No components have been picked

Partial

Some have been received into on-hand inventory

Printed

Shop paper has been printed or queued for printing

Pending close

Order has not been received to stock with the Receiving and Inspection (IRI) program

Parent item no

The parent item number ordered on this manufacturing order

Description

The description of the parent item

ECL

The Engineering Change Level for this manufacturing order

RRL

The Routing Revision Level for this manufacturing order

Qty ordered

The quantity of this parent item to be manufactured for this order

Qty scrapped

The quantity of the parent item scrapped

Qty received

The quantity received into inventory

Qty rejected

The quantity of this item rejected during inspection

Qty stocked

The quantity received into inventory in the stocking unit of measure; this quantity can differ from the Qty received if some are awaiting inspection

Released

The date the manufacturing order was created

Due

The date this order is due

Picked

The date components were picked

Completed

The date this order was completed

The program displays these fields for each operation:

Field Name

Displays

Oper seq

The operation sequence number

Accum lbr cost

The total labor cost to date for this operation

For a regular operation: Hours per piece x Good pieces x Direct labor rate

For a batch operation: (Hours per batch / Pieces per batch) x Good pieces x Direct labor rate

Accum lbr OH

The total labor overhead cost: Labor cost x Total overhead rate for work center x .01

Accum mach OH

For an unattended operation: (Hours per piece x Machine labor rate x Good pieces) + (Hours per piece x Machine labor rate x Good pieces  x Total overhead rate for work center x .01)

Accum setup cost

The setup cost per operation: Setup time x Setup labor rate

For a regular or unattended operation: (Good pieces / Standard lot size) x (Setup time x Setup labor rate)

For a batch operation: (Good pieces / Pieces per batch) x (Setup time x Setup labor rate)

Accum oth cost

The labor hours entered in the Labor Entry Maintenance (LLE) program or imported with the Labor Import (LEI) program for the Labor code O (Other)

Accum OS serv

The total outside service cost for this operation

Accum rwrk cost

The labor hours spent repairing pieces for this order

Oper type

Operation type:
Batch
Indirect
Purchased service
Regular  
Unattended

Work center

The work center at which this operation occurs

Good

The quantity of usable pieces completed

ST

The operation sequence type: Standard or Alternate

Mach no

The machine number for the work center

Accum scrap pieces

The quantity scrapped

% Comp

The percent of this operation that has been completed

Oper cd

The operation code

Remaining

The quantity not yet completed

  1. (Optional) Highlight a line and click Routing to display hours per piece, setup time, setup and direct labor codes, and other information. The information that displays depends on the operation type:

If operation type

See

R for Regular or B for Batch

Display a Regular or Batch Operation

P for Purchased service

Display a Purchased Service Operation

I for Indirect

Display an Indirect Operation

U for Unattended

Display an Unattended Operation

Click OK to return to this program.

  1. Choose the appropriate options:

To

Do This

Print WIP costs

Click Print. See Print an Inquiry.

Display only total labor, labor overhead, machine overhead, setup, other, outside service, and rework costs

Click Totals. Click Totals again to return to the operation list.

Display components for this manufacturing order

Click Component. See Display Component Requirements. Click OK to return to this program.

Display hours per piece, setup time, setup and direct labor codes for an operation

Highlight a line and click Routing. See step 2.

Display labor detail for this manufacturing order

Click Labor. See Display Labor for a Manufacturing Order.

Specify a different manufacturing order

Click OK. See step 1.