View Current ECO Bill of Material
When you click View Current BOM, the bill of material at the "Old ECL" is displayed. The header includes:
Field Name |
Displays |
Parent item no |
The parent item of the displayed bill |
ECL |
The old ECL |
Desc |
The description of the parent item; the status of the ECO is displayed to the right of the description |
Eng drawing no |
The drawing number for the old ECL; if blank, the drawing number for the parent is displayed |
Bill audited date |
The date of the last bill of material audit |
Bill auditor |
The person who completed the last bill of material audit |
Eng appr date |
The date the bill was approved by engineering |
QA appr date |
The date the bill was approved by quality assurance |
Mfg appr date |
The date the bill was approved by manufacturing |
Bill of material component information is displayed:
Field Name |
Displays |
Sub |
Indicates if substitutions are allowed for this component |
Comp item no |
The component item number |
Description |
The component's description |
Part des |
The identifier your company uses if this component is to be listed on this bill of material more than once. Examples: balloon number, bubble number, file number, material tag, or reference number |
FS code |
The component's floor stock code |
Qty per assy |
The quantity of this component required to build one parent |
Matl cost |
The component's standard material cost |
| Stk UOM | The component's stocking unit of measure |
Type |
The component type; this field is not used by PowerShift, but it may be used for custom reporting |
| Ref cd | The component's reference code |
| Op seq | The operation sequence number at which this component is used |
M/B/K |
The component's make/buy/kit flag value |
LLC |
The component's low level code |
| Lead time | The component's lead time |
| Effective | The date the component started being used in building this parent |
| Expiration | The date after which the component will not be used in building this parent |
| Revised | The date the component was changed |
| Comp ref | The reference entered when the BOM was created |
Choose the appropriate options:
To |
Do This |
Change the display options |
Click Prog opts. See Set Options for Reports and Inquiries. |
Change a component item or its attributes |
Click Modify BOM and select an action. If changes are on file they are listed. Options enable you to:
See Modify BOM. |
Print the list of components |
Click Print. See Print. |
Return to the previous screen |
Click OK. |
Modify BOM
When modifying an existing ECO bill of material, you can add a new component, delete an existing component or change attributes of an existing component.
- Add a New Component
Select the Add action and enter the bill of material attributes. See Enter a Bill of Material.
Delete an Existing Component
Select the Delete action then enter the component and part designator to be deleted. The combination of component and part designator must be valid (i.e., must exist on the current BOM).Change Component Attributes
Select the Change action and enter a component and part designator that exists on the current ECO bill. Two columns are displayed with the initial values; alter the values in the first column as you would Change a Bill of Material in Bill of Material Maintenance (MPS).