Display Manufacturing Order Costs

Use the Manufacturing Order Cost Inquiry (MJI) program to display costs incurred to date and projected costs to complete a manufacturing order. See Background and Road Map for more information.

Note
If you accessed this program from another program, skip step 1.

  1. Enter the manufacturing order number or click the Lookup icon and use the standard lookup options to select the manufacturing order from a list.

The program displays these fields for the manufacturing order:

Field Name

Displays

Mfg order no

The manufacturing order number that you entered or selected followed by its status:

Complete

The order quantity has been received into on-hand inventory

Closed by user

User clicked Close order in the Manufacturing Maintenance (MIM) program

Closed by rcv

Received less than quantity ordered and clicked Close order? in the Receiver Maintenance (IRC) program

In picking

Some components have been picked

Open

No components have been picked

Partial

Some have been received into on-hand inventory

Printed

Shop paper has been printed or queued for printing

Pending close

Order has not been received to stock with the Receiving and Inspection (IRI) program

Parent item no

The parent item number ordered on this manufacturing order

Description

The description of the parent item

ECL

The Engineering Change Level for this manufacturing order

RRL

The Routing Revision Level for this manufacturing order

Costing mth

Costing method: Material costs to date are based on your setting for the Costing method for job cost option in the System Options Maintenance (XM) program (Manufacturing Options) for your manufacturing branch:

Act
: Actual unit cost
Avg
: Average unit cost
Std
: Standard unit cost

Qty ordered

The quantity of this parent item to be manufactured for this order

Qty scrapped

The quantity that has been scrapped

Qty received

The quantity received into on-hand inventory

Qty rejected

The quantity of this item rejected during inspection

Qty stocked

The quantity received into inventory in the stocking unit of measure; this quantity can differ from the Qty received if some are awaiting inspection

Released

The date the manufacturing order was created

Due

The date this manufacturing order is due to be completed

Picked

The date that components were picked for this order

Completed

The date that this order was completed and received into on-hand inventory

The program displays these Costs-to-date for the manufacturing order:

Field Name

Displays

Material

Standard

Total standard material cost of components required to build the quantity ordered:

Sum of components (Quantity per assy + (Scrap % x 0.01)) x Standard unit cost

The system captured the quantity required when you released the order. If the Qty received differs from the Qty ordered, the system updates the quantity required.

Act, Ave, or Std to date

Cost to date: (Quantity picked x Unit cost) + Material stock adjustments + Special purchase adjustments

Your setting for the Costing method for job cost option in the System Options Maintenance (XM) program (Manufacturing Options) determines the unit cost:

Setting

Label

Unit cost

A

Avg

Average

B

Act

Actual

S

Std

Standard

Variance

Cost to date - Standard

% Std

(Cost to date / Standard) x 100

Outside srv

Standard

For a purchased service operation: Cost per piece x Quantity required

Cost to date

(PO unit cost x Quantity received) + Outside service adjustments

Variance

Cost to date - Standard

% Std

(Cost to date / Standard) x 100

Labor

Standard

Total standard cost to build the quantity ordered depends on the operation type:

Type

Setups

Calculation

Regular

1

(Hours per piece x Quantity ordered x Direct labor rate) + (Setup time x Setup labor rate)

Regular

Multiple

Quantity ordered / Standard lot size = Number of setups rounded up to the next integer

(Hours per piece x Quantity ordered x Direct labor rate) + (Number of setups x Setup time x Setup labor rate)

Unattended

1

Setup time x Setup labor rate

Unattended

Multiple

Quantity ordered / Standard lot size = Number of setups rounded up to the next integer

Number of setups x Setup time x Setup labor rate

Batch

 

Quantity ordered / Pieces per batch = Number of batches rounded up to the next integer

((Hours per batch / Pieces per batch) x Good pieces) + ((Good pieces / Pieces per batch) x Setup time)

(Number of batches x Hours per batch x Direct labor rate) + (Number of batches x Setup time x Setup labor rate)

Cost to date

Total labor cost for completed operations + Labor adjustments

If you enter pieces completed with the WIP Movement (WIPM) program for a regular operation: (Good pieces + Scrap pieces) x (Hours per piece x Direct labor rate)

For a batch operation: ((Hours per batch / Pieces per batch) x (Good pieces x Direct labor rate)

If you enter reported hours with the Labor Entry (LLE) program or import them with the Labor Import (LEI) program for labor codes D (Direct), I (Indirect), O (Other), R (Rework), and U (Setup): (Regular hours + Overtime hours) x Direct labor rate

The system updates labor when you complete operations. See Background.

Variance

Cost to date - Standard

% Std

(Cost to date / Standard) x 100

Labor ovhd

Standard

Total labor overhead cost to build the quantity ordered: (Labor cost x Overhead percentage

Cost to date

If you entered pieces completed with the WIP Movement (WIPM) program: (Good pieces + Scrap pieces) x (Hours per piece or batch x Direct labor rate) + (Number of setups x Setup time x Setup labor rate) x (Total overhead rate for work center x .01) + Labor overhead adjustments

If you entered actual hours with the Labor Entry (LLE) program or imported them with the Labor Import (LEI) program: (Regular hours + Overtime hours x Direct labor rate) x (Total overhead rate for work center x .01) + Labor overhead adjustments

The system updates labor overhead when you complete operations. See Background.

Variance

Cost to date - Standard

% Std

(Cost to date / Standard) x 100

Machine ovhd

Standard

For an unattended operation: ((Setup hours x Machine rate) / Standard lot size) + Hours per piece x Machine rate) + ((Setup hours x Machine rate) / Standard lot size) + (Hours per piece x Machine rate) x Overhead percentage)

Machine labor rate is from the Machine lbr cd field in the Work Center Maintenance (WCM) program. If this field is blank, the program uses the Setup labor cd field for the unattended operation in Routing Maintenance (RTM) program.

Cost to date

For an unattended operation: (Setup hours x Machine rate) / Standard lot size) + Hours per piece x Machine rate) + ((Setup hours x Machine rate) / Standard lot size) + (Hours per piece x Machine rate) x Overhead percentage) + Machine overhead adjustments

The system updates machine overhead when you complete an unattended operation.

Variance

Machine overhead - Burden applied

% Std

(Cost to date / Standard) x 100

Adjustments

Cost to date

Type X (Miscellaneous) entered in the Manufacturing Cost Adjustments (MCA) program

Note
Other types of adjustments are added to the appropriate costs:

Adjustment type

Added to

M (Material stock)
P (Special purchase)

Material

S (Outside service)

Outside srv

L (Labor)

Labor

O (Labor overhead)

Labor ovhd

U (Machine overhead)

Machine Ovhd

Click Adjustment to display a list of all adjustments.

Variance

Actual adjustments

Totals

Standard

Total standard cost to build the quantity ordered: Material + Outside services + Labor + Labor overhead + Machine overhead

Act, Std, or Ave to date

Total cost to date to build the quantity completed: Material + Outside services + Labor + Labor overhead + Machine overhead + Adjustments

Variance

Cost to date - Standard

% Std

(Cost to date / Standard) x 100

For open orders, the program displays these Projected costs for the completion of the manufacturing order:

Field Name

Displays

Material

To complete

The cost of the materials to be picked for this manufacturing order; if Costing method for job costs option is:

If

The program calculates

A

Qty to pick x Average unit cost

B

Qty to pick x Actual unit cost

S

Qty to pick x Standard unit cost

Total

Total material cost incurred to date plus the cost of the quantity that remains to be picked; if Costing method for job costs option is:

If

The program calculates

A

Average cost to date + Cost to complete

B

Actual cost to date + Cost to complete

S

Standard cost to date + Cost to complete

Standard

Standard material cost of components required to build the quantity ordered: Qty ordered x Standard unit cost

Variance

Total - Standard

% Std

(Total / Standard) x 100

Outside srv

To complete

Remaining outside service costs to be incurred to complete the manufacturing order: Standard - Cost to date

Total

Total actual outside service cost to date plus the remaining standard outside service cost required to complete: Standard - Cost to date

Standard

Standard outside service cost required to build the quantity ordered

Variance

Total - Standard

% Std

(Total / Standard) x 100

Labor

To complete

Remaining labor costs to be incurred to complete the manufacturing order: Standard - Cost to date

Total

Total labor cost to date plus the remaining standard labor cost required to complete: Cost to date + To complete

Standard

Standard labor cost to build the quantity ordered based on the operation sequences

Variance

Total - Standard

% Std

(Total / Standard) x 100

Ovhd

To complete

Remaining labor and machine overhead to be incurred to complete the manufacturing order: (Standard labor overhead + Standard machine overhead) - (Labor overhead to date + Machine overhead to date)

Total

Standard labor overhead + Standard machine overhead

Standard

Standard labor overhead + Standard machine overhead

Variance

Total - Standard

% Std

(Total / Standard) x 100

Totals

To complete

Material + Outside srv + Labor + Ovhd

Total

Actual cost to date plus remaining cost to complete: Cost to date + To complete

Standard

Total standard cost to make the quantity ordered

Variance

Total - Standard

% Std

(Total / Standard) x 100

  1. Choose the appropriate options:

To

Do This

Review your options for this program

Click Prog opts. See Set Options for Reports and Inquiries.

Display notes about this item

Click Notes.

Display material costs for components

Click Materials. See Display Component Costs. Click OK to return to this program.

Display purchases for this manufacturing order

Click Matl/OS. See Display Purchases for a Manufacturing Order. Click OK to return to this program.

Display work in process

Click WIP status. See Display Work in Process Information. Click OK to return to this program.

Display cost adjustments

Click Adjustment. See Display Manufacturing Cost Adjustments. Click OK to return to this program.

Display labor costs

Click Labor. See Display WIP Labor Costs. Click OK to return to this program.

Display pickings for this order

Click Picks. See Display Picking for a Manufacturing Order. Click OK to return to this program.

Display receivers for this order

Click Receipts. See Display Receivers for Orders. Click OK to return to this program.

Display the supply orders for this manufacturing order

Click Supply. See Display the Supply Order. Click OK to return to this program.

Display the linked demand orders

Click Demand. See Display the Demand Order. Click OK to return to this program.

Change data in custom fields your company uses

Click User field. See Enter Data in User or Shadow File Fields.

Note

This button displays only if you have set up user fields for this program in the User Fields Maintenance (XMO) program.

Print the display

Click Print. See Print an Inquiry.

Display serial numbers assigned to this parent item

Click Pre-assign. See Display Pre-Assigned Control Numbers. Click OK to return to this program.

This button displays only if the Pre-assigned ctrl no? field is selected in the parent item's record in the Enterprise Item Maintenance (IM) program.

Specify a different manufacturing order

Click OK.

Exit the program

Click Exit.