Add Item Components on an ECO Bill of Material
When you click ECO items and then click BOM in the ECO Maintenance (ECO) program, you can add, change, and delete an item's components on an engineering change order bill of material. See Background and Road Map for more information.
Enter these fields:
Field Name |
Type / Max Length |
Action / Description |
Action |
Required |
Select the action
for a component: |
Comp item no |
Required |
Enter the number
of the component, click the right Lookup
icon to select a component in the ECO, or click the left Lookup and use the standard
lookup options to select a component from your database. |
Part designator |
Optional |
Enter the identifier your company uses if this component is to be listed on this bill of material more than once. You may call this designator a balloon number, bubble number, file number, material tag, or reference number. |
Enter these fields:
Field Name |
Type / Max Length |
Action / Description |
Qty per assy |
Required |
Enter the quantity
of the component required to build one parent item. For example,
if the parent item is a table and the component is a table leg,
you would enter 4. You can enter .00000 for a component whose
usage is insignificant. |
Reference code |
Optional |
Enter a reference
that your company uses. For example, you can use this field to
associate this component with its balloon or bubble number on
the engineering drawing. |
Flr stk cd |
Required |
Accept the displayed
code, select 0 to pick
this component from on-hand inventory, or select 1
to backflush it from floor stock. |
LT offset |
Optional |
Enter the number
of days after a manufacturing order is released that the component
is required. |
Setup matl loss |
Optional |
Enter the quantity
of material that you typically lose during the setup of the operation. |
Scrap % |
Optional |
Enter the percent
of this component that you normally scrap during the manufacturing
process. The system increases
the quantity required by this scrap factor: (Quantity
ordered
x Qty per assy) + (Quantity
ordered
x Qty per assy x Scrap % x 0.1) rounded
to the nearest integer.
If your scrap factor is 5%, enter
5.00. |
Effective date |
Required |
Accept the displayed login date, select another date, or enter a date shortcut. |
Expiration date |
Required |
Select the date through which this component will be used for manufacturing orders, enter a date shortcut, or leave blank to use 12/31/9999. |
Date revised |
Optional |
Accept the displayed login date, select another date, or enter a date shortcut when you revised this BOM. |
Component type |
Optional |
Enter your user-defined code for component type. This field is not used by the system, but you can use it in the custom reports. |
Operation seq no |
Conditional |
If you want to
backflush picking, enter the operation sequence number when you
want the system to pick this component. For example, if this component
is not required until the third operation, enter that sequence
number. |
Comp reference |
Optional |
Enter the reference
your company uses. |
Replacement item? |
Optional |
Select if you replace this component under warranty or leave blank if you do not. |
Critical item? |
Optional |
Select if this
component is critical to this BOM or leave blank if it is not. |
Subs prohibited? |
Optional |
Select to prevent a substitution when this item is not available or leave blank to allow substitutions. |
Choose the appropriate options:
To |
Do This |
Change a field |
Click Modify. See Change Item Components on an ECO Bill of Material. |
Delete this component |
Click Delete. See Delete. |
Exit without changing this record |
Click Cancel. |
Enter change notes |
Click Notes. See Enter Notes or Change Notes. |
Go to a related program |
Click Jump. See Jump. |
Accept the data |
Click OK. |
Choose the appropriate options when you click OK or Cancel:
To |
Do This |
Add another component |
Click Add. |
Delete the selected component |
Click Delete. See Delete. |
Copy a selected component |
Click Copy. |
Display the selected component |
Click Select. |
Display components from a specific action or component |
Click Restart. The program prompts Action, Comp item no and Part designator. Enter the first component you want to display or leave blank to begin with the first component in the file. |
Print the component listing |
Click Print. See Print. |
Display the previous set of records in the file |
Click Page up. |
Display the next set of records in the file |
Click Page down. |
Exit this bill of material |
Click Exit. |
Choose the appropriate options when you click Exit:
To |
Do This |
||||||||||
Change a field |
Click Modify. |
||||||||||
Delete this project |
Click Delete. The program prompts Do you want to delete this record?. Click Delete to delete this entire project or click No to retain this project. |
||||||||||
Exit without creating this project |
Click Cancel. |
||||||||||
Enter notes for this project |
Click Notes. See Enter Notes. |
||||||||||
Enter an item, its branch information, and costs |
Click Inventory and then:
|
||||||||||
Add, change, and delete an item's components on the bill of material |
Click BOM. |
||||||||||
Apply component changes to multiple bills of material |
Click Component action and then click:
|
||||||||||
Accept the data and exit |
Click OK. |
Choose the appropriate options when you click OK or Cancel:
To |
Do This |
Select items |
Click Add. See Select Engineering Change Order Items. |
Delete the selected parent item |
Click Delete. See Delete. |
Copy the selected item |
Click Copy. |
Display the selected parent item |
Click Select. |
Display parent items from a specific number |
Click Restart. The program prompts Parent item no and ECL. Enter the first item number you want to display or leave blank to begin with the first item in the file. |
Print the parent item listing |
Click Print. See Print. |
Display the previous set of records in the file |
Click Page up. |
Display the next set of records in the file |
Click Page down. |
Display changes to items |
Click View changes. See Display ECO Item Changes. |
Assign the next available engineering change level |
Click Assign ECL. |
Exit this bill of material |
Click Exit. |
Choose the appropriate options when you click Exit:
To |
Do This |
||||||||||||
Change a field |
Click Modify. See Change an Engineering Change Order. |
||||||||||||
Exit without creating this change order |
Click Cancel. |
||||||||||||
Enter notes and enter the reason for creating the change order |
Click Notes. Click Reason for change and enter the reason for the change order. See Enter Notes. |
||||||||||||
Enter or change data in custom fields your company uses |
Click User. See Enter Data in User and Shadow File Fields. This button displays only if you have set up user fields for this program in the User Fields Maintenance (XMO) program. |
||||||||||||
Close this engineering change order |
Click Close ECO. See Close an Engineering Change Order. |
||||||||||||
Select the compliance, effectivity, and type of change codes for this change order |
Click ECO impact and then:
|
||||||||||||
Select the required signoffs for this change order |
Click Sign off. See Select ECO Signoffs. |
||||||||||||
Select the required implementation signoffs for this change order |
Click Implement. See Select ECO Implementation Signoffs. |
||||||||||||
Maintain ECO costs, view the cost summary, and calculate costs |
Click Costs and then:
|
||||||||||||
Select the item numbers required for the change order |
Click ECO
items. |
||||||||||||
Send out notifications for approval signoff |
Click Appvl/Signoff. See Background for more information. |
||||||||||||
Send out notifications for implementation approval signoff |
Click Appvl/Implement. See Background for more information. |
||||||||||||
Print the engineering change order |
Click Print ECO. See Print or Reprint Documents. |
||||||||||||
Accept the data and exit this order |
Click OK. |
Choose the appropriate options when you click OK or Cancel:
To |
Do This |
Display the selected project |
Click OK. |
Display the previous record in the file |
Click Prev. |
Display the next record in the file |
Click Next. |
Enter a new project |
Click New. |
Exit the program |
Click Exit. |