Enter Costs for a Project Item
When you click Inventory and then Item cost in the Project Maintenance (PSM) program, you can enter and change costs for a project item. See Background and Road Map for more information.
The program displays these fields for each item:
|
Field Name |
Displays |
|
Item number |
The item number |
|
Type |
New: New item for this project |
|
Project |
Project number |
|
Br |
The number of the project branch |
|
Standard cost |
The standard unit cost for this item If you entered vendor pricing for a project component, when you click Roll up its standard cost is the unit price for the lowest quantity estimate. For example, suppose that the vendor's unit price breaks are: The standard cost for the new parent item uses the unit price for the last quantity estimate. Therefore, the standard cost of all the components may not equal the standard cost of the parent. In this example the unit price for the last quantity estimate is 9.25. |
|
Base year cost |
The baseline cost you can compare with other costs |
|
Last CRU |
The date of the last cost rollup for this item |
|
Vend price |
The item's purchase price from the vendor or Project displays if the item is manufactured |
-
Select the item for which you want to enter cost data and click Select.
Note
If you copied the item from your database, you cannot change its fields. -
Enter data in these fields:
|
Field Name |
Type / Max Length |
Action / Description |
||||||||
|
Incr matl cost |
Optional |
For a component, enter the material cost incurred at this item's level of the bill of material. Do not include the material cost of components or subassemblies below this item. |
||||||||
|
Incr labor cost |
Optional |
Enter the labor cost incurred at this item's level of the bill of material. Do not include the labor cost of components or subassemblies below this item. After you click Roll up, this field displays labor costs based on the item's routing. |
||||||||
|
Incr ovhd cost |
Optional |
Enter the overhead cost incurred at this item's level of the bill of material. This amount is in addition to that calculated for the overhead codes for this item. Do not include the overhead cost of components or subassemblies below this item. After you click Roll up, this field displays overhead costs calculated based on overhead codes for the item or the overhead codes in the Work Center Maintenance (WCM) for the routings used for this item. |
||||||||
|
Incr OS cost |
Optional |
Enter the outside service cost incurred at this item's level of the bill of material. Do not include outside service cost for components or subassemblies below this item. |
||||||||
|
Overhead code 1 - 4 |
Conditional/Optional |
If this is an item you buy, select a code that identifies the type of overhead cost for this item. |
||||||||
|
Cost differential |
Optional |
Enter a cost differential that your company uses. This field is not used by the system, but you can use it in custom reports. |
||||||||
|
Loaded cost |
Optional |
Enter a cost that includes the item cost (actual or average) plus an adjustment, such as a percent of overhead. You can use loaded cost as a basis for pricing in the Price-Contract Maintenance (PCM) program. The system does not maintain loaded cost. |
||||||||
|
Base year cost |
Optional |
Enter the baseline cost you can compare with other costs. |
||||||||
|
User defined cost |
Optional |
Enter a cost that your company tracks. This field is not used by the system, but you can use it in custom reports. |
||||||||
|
First rcvd cost |
Optional |
Enter the cost of the first unit you received. This field is not used by the system, but you can use it in custom reports. |
||||||||
|
First rcvd date |
Optional |
Select the date on which you received the first unit or enter a date shortcut. This field is not used by the system, but you can use it in custom reports. |
||||||||
|
Average cost |
Display only |
The average unit cost of the item. For new project items, this field will be zero. |
||||||||
|
Actual cost |
Display only |
The most recent unit cost of the item. For new project items, this field will be zero. |
||||||||
|
Declared value |
Optional |
Enter the item's declared value for shipping purposes. |
||||||||
|
Required |
Enter the taxability type:
Note |
-
Choose the appropriate options:
|
To |
Do This |
|
Accept the data and exit this item |
Click OK. |
|
Exit without entering this data |
Click Cancel. |
|
Update the record |
Click Apply. |
|
Enter notes |
Click Notes. See Enter Project Notes for Items. |
|
Enter vendor pricing |
Click Vend price. See Enter Vendor Pricing for a Project Item. |
-
Choose the appropriate options when you click OK or Cancel:
|
To |
Do This |
|
Display the selected item |
Click Select. |
|
Display items from a specific item number |
Click Restart. The program prompts Item number and Branch. Enter the number for the first item to display or leave blank to begin the display with the first item in the file. |
|
Print the item listing |
Click Print. See Print. |
|
Display the previous set of records in the file |
Click Page up. |
|
Display the next set of records in the file |
Click Page down. |
|
Exit item costs |
Click Exit. |
-
Choose the appropriate options when you click Exit:
|
To |
Do This |
||||||||||
|
Change a field |
Click Modify. |
||||||||||
|
Delete this project |
Click Delete. The program prompts Do you want to delete this record?. Click Delete to delete this entire project or click No to retain this project. |
||||||||||
|
Exit without creating this project |
Click Cancel. |
||||||||||
|
Display additional fields |
Click Other info. |
||||||||||
|
Enter notes for this project |
Click Notes. See Enter Notes. |
||||||||||
|
Enter an item, its branch information, and costs |
Click Inventory and then:
|
||||||||||
|
Enter quantities, profit, commission, and discount percents |
Click Proj qtys. See Enter a Project Quantity. |
||||||||||
|
Enter a bill of material |
Click BOM. See Enter a Project Bill of Material. |
||||||||||
|
Enter a routing |
Click Routing. See Enter a Routing. |
||||||||||
|
Enter a new customer |
Click Customer. See Enter a New Customer. This button displays only if you entered a new customer in the Customer number field. |
||||||||||
|
Enter miscellaneous costs |
Click Misc costs. See Enter Miscellaneous Costs. |
||||||||||
|
Calculate costs for project quantities |
Click Roll up. |
||||||||||
|
Display the project and unit costs for project quantities |
Click Summary. See Display a Project Summary. |
||||||||||
|
Print documents for this project |
Click Print and then:
|
||||||||||
|
Transfer this project to your database |
Click Transfer. See Transfer a Project. |
||||||||||
|
Close this project |
Click Close proj. See Close a Project. |
||||||||||
|
Display the sales quote generated by this project or the sales order line if the sales quote has been transferred |
Click Order. See Enter a Sales Quotation or Display a Summarized Sales Order. |
||||||||||
|
Accept the data and exit this project |
Click OK. |
-
When you click OK or Cancel, enter another project number or exit the program.