Enter Vendor Pricing for a Project Item
When you click Inventory, click Item, select an item, and then click Vend price in the Project Maintenance (PSM) program, you can select a vendor and enter or change vendor pricing. See Background and Road Map for more information.
-
Enter data in this field:
|
Field Name |
Type / Max Length |
Action / Description |
|
Vendor number |
Required |
Enter the vendor number or click the Lookup icon and use the standard lookup options to select the vendor from a list. |
-
Enter data in these fields:
|
Field Name |
Type / Max Length |
Action / Description |
||||||||||||
|
Sequence number |
Required |
Accept the displayed number. |
||||||||||||
|
Vendor item no |
Optional |
Enter the vendor's number for this item or a description of the item that identifies this item from this vendor. |
||||||||||||
|
QA approved? |
Optional |
Select if quality assurance has approved this item or leave blank if QA has not approved this item. |
||||||||||||
|
Preferred item? |
Optional |
Select if this item is preferred over other equivalent items from the vendor or leave blank if this item is not preferred. |
||||||||||||
|
Inspection? |
Optional |
Select if you want this item to be inspected when you receive it from this vendor or leave blank if you do not. |
||||||||||||
|
Material/Labor |
Required |
Select M for material or L for labor (a purchased service). |
||||||||||||
|
Purchasing UOM |
Required |
Select the unit of measure in which you purchase this item from this vendor. |
||||||||||||
|
UOM conversion |
Required |
Accept 1.0000 if you purchase and stock this item in the same unit or enter the conversion factor if you purchase the item in a different unit than you stock it.
|
||||||||||||
|
Intransit LT |
Optional |
Enter the number of days lead time needed to transport this item from this vendor to your facility. |
||||||||||||
|
Freight |
Optional |
If you are using the standard cost method, select a landed cost code for freight charges. Select Y if you are using the actual cost method or leave blank if this landed cost dose not apply to this vendor and item. See Overview: Landed Costs. |
||||||||||||
|
Duty |
Optional |
If you are using the standard cost method, select a landed cost code for duty charges. Select Y if you are using the actual cost method or leave blank if this landed cost dose not apply to this vendor and item. See Overview: Landed Costs. |
||||||||||||
|
Excise |
Optional |
If you are using the standard cost method, select a landed cost code for excise tax. Select Y if you are using the actual cost method or leave blank if this landed cost dose not apply to this vendor and item. See Overview: Landed Costs. |
||||||||||||
|
Misc |
Optional |
If you are using the standard cost method, select a landed cost code for miscellaneous landed costs. Select Y if you are using the actual cost method or leave blank if this landed cost dose not apply to this vendor and item. See Overview: Landed Costs. |
-
Click Pricing.
-
To enter price breaks, see Enter Price Breaks.
-
Enter data in these fields for a standard item:
|
Field Name |
Type / Max Length |
Action / Description |
||||||||||||
|
Special pricing? |
Optional |
Accept the selection to enter special costs for this project item, or deselect to use default pricing for this item. |
||||||||||||
|
Allocate price? |
Optional |
Select if you want to allocate pricing when the project quantity is less than the minimum buy quantity 1 or leave blank if you do not. |
||||||||||||
|
Quantity |
Optional |
Enter the minimum quantity you must order to qualify for the unit price the vendor offers. |
||||||||||||
|
Cost |
Optional |
Enter the price per unit in the vendor's currency for this minimum order quantity.
|
-
Choose the appropriate options:
|
To |
Do This |
|
Change a field |
Click Modify. |
|
Exit without adding this vendor item |
Click Cancel. Add another item and vendor or click Exit.. |
|
Enter notes for this vendor and item |
Click Notes. See Enter Notes. |
|
Accept the data and exit |
Click OK. The program prompts Vendor number. Enter another vendor or leave blank to exit. |
-
Choose the appropriate options when you click OK or Cancel:
|
To |
Do This |
|
Add another item and vendor |
Click Add. |
|
Delete the selected item and vendor |
Click Delete. See Delete. |
|
Copy the selected item and vendor |
Click Copy. See Copy. |
|
Display the selected item and vendor |
Click Select. |
|
Display items from a specific vendor number |
Click Restart. Enter the data for the first record you want to display or leave blank to begin the display with the first record in the file. |
|
Print the item and vendor listing |
Click Print. See Print. |
|
Display the previous set of records in the file |
Click Page up. |
|
Display the next set of records in the file |
Click Page down. |
|
Exit vendor pricing |
Click Exit. |
-
Choose the appropriate options:
|
To |
Do This |
|
Change a field |
Click Modify. |
|
Exit without adding this item |
Click Cancel. Enter another item or click Exit. |
|
Display additional information |
Click Other info. |
|
Enter notes for this item |
Click Notes. See Enter Project Item Notes. |
|
Enter vendor pricing for this item |
Click Vend Price. |
|
Generate a Uniform Product Code or Global Trade Item Number for this item |
Click UPC gen. The program prompts UPC no [number] will be assigned to this item. Continue?. Click Cancel to cancel the action or click OK to assign this UPC code to this item. |
|
Display a graphic of this item |
Click View image. Click Close to remove the image from the display. |
|
Accept the data |
Click OK. The program prompts Item number. Enter another item or leave blank to exit. |
-
Choose the appropriate options when you click OK or Cancel:
|
To |
Do This |
|
Display the selected item |
Click Select. |
|
Display items from a specific item number |
Click Restart. The program prompts Item number and Branch. Enter the number for the first item to display or leave blank to begin the display with the first item in the file. |
|
Print the item listing |
Click Print. See Print. |
|
Display the previous set of records in the file |
Click Page up. |
|
Display the next set of records in the file |
Click Page down. |
|
Exit item costs |
Click Exit. |
-
Choose the appropriate options when you click Exit:
|
To |
Do This |
||||||||||
|
Change a field |
Click Modify. |
||||||||||
|
Delete this project |
Click Delete. The program prompts Do you want to delete this record?. Click Delete to delete this entire project or click No to retain this project. |
||||||||||
|
Exit without creating this project |
Click Cancel. |
||||||||||
|
Display additional fields |
Click Other info. |
||||||||||
|
Enter notes for this project |
Click Notes. See Enter Notes. |
||||||||||
|
Enter an item, its branch information, and costs |
Click Inventory and then:
|
||||||||||
|
Enter quantities, profit, commission, and discount percents |
Click Proj qtys. See Enter a Project Quantity. |
||||||||||
|
Enter a bill of material |
Click BOM. See Enter a Project Bill of Material. |
||||||||||
|
Enter a routing |
Click Routing. See Enter a Routing. |
||||||||||
|
Enter a new customer |
Click Customer. See Enter a New Customer. This button displays only if you entered a new customer in the Customer number field. |
||||||||||
|
Enter miscellaneous costs |
Click Misc costs. See Enter Miscellaneous Costs. |
||||||||||
|
Calculate costs for project quantities |
Click Roll up. |
||||||||||
|
Display the project and unit costs for project quantities |
Click Summary. See Display a Project Summary. |
||||||||||
|
Print documents for this project |
Click Print and then:
|
||||||||||
|
Transfer this project to your database |
Click Transfer. See Transfer a Project. |
||||||||||
|
Close this project |
Click Close proj. See Close a Project. |
||||||||||
|
Display the sales quote generated by this project or the sales order line if the sales quote has been transferred |
Click Order. See Enter a Sales Quotation or Display a Summarized Sales Order. This button displays only for a transferred customer project. |
||||||||||
|
Accept the data and exit this project |
Click OK. |
-
When you click OK or Cancel enter another project or exit the program.