Add a Subassembly to a Project BOM
When you click BOM in the Project Maintenance (PSM) program, you can enter, change, and copy a project bill of material, add a subassembly, add, copy, merge, and delete components. See Background and Road Map for more information.
-
Click Add to enter a new subassembly.
-
Enter these fields:
|
Field Name |
Type / Max Length |
Action / Description |
|
Parent item no / Subassembly |
Required |
Enter the number of the new subassembly or click the Lookup icon and use the standard lookup options to select the item number from a list. You must first click Inventory and then Item to create a record for this item. |
|
ECL |
Required |
Enter an Engineering Change Level for this bill of material. If you leave blank, the program prompts Use the current ECL? Click Yes to use it or click No to enter a different ECL. If you click Yes and the Current ECL field for this item is blank, the program prompts Product structure with blank ECL does not exist. Create it? Click Yes to create it or click No to cancel this action. ECLs should be assigned a number. |
The Eng drawing no field displays the drawing number you entered in that field in the item's branch record.
-
Enter data in these fields:
|
Field Name |
Type / Max Length |
Action / Description |
|
Eng approved? |
Optional |
Select if the engineering department approved this bill of material or leave blank if it has not. |
|
Eng appr date |
Optional |
Accept the login date, select another date, or enter a date shortcut when engineering approved this BOM. |
|
Bill audited date |
Optional |
Accept the login date, select another date, or enter a date shortcut when this BOM was audited |
|
Bill auditor |
Optional |
Enter the name of the person who audited this BOM. |
|
QA approved? |
Optional |
Select if the quality assurance department approved this BOM or leave blank if it has not. |
|
QA appr date |
Optional |
Accept the login date, select another date, or enter a date shortcut when QA approved this BOM. |
|
Mfg approved? |
Optional |
Select if the manufacturing department approved this BOM or leave blank if it has not. |
|
Mfg appr date |
Optional |
Accept the login date, select another date, or enter a date shortcut when manufacturing approved this BOM. |
-
Click Component. You can add components to the BOM or merge components from another project or from an item in your database. See:
-
Choose the appropriate options:
|
To |
Do This |
|
Change a field |
Click Modify. |
|
Exit without adding this component |
Click Cancel. The program prompts Comp item no and Part designator. Enter the next component or leave blank to exit. |
|
Enter notes |
Click Notes. See Enter Notes. |
|
Accept the data |
Click OK. The program prompts Comp item no and Part designator. Enter the next component or leave blank to exit. |
Note
You cannot delete a record until it has been saved; use Cancel.
-
Choose the appropriate options when you click OK or Cancel:
|
To |
Do This |
|
Add another component |
Click Add. |
|
Delete the selected component |
Click Delete. See Delete. |
|
Copy a selected component |
Click Copy. See Copy a Component in a Project Bill of Material. |
|
Display the selected component |
Click Select. |
|
Display components from a specific component |
Click Restart. The program prompts Comp item no and Part designator. Enter the first component you want to display or leave blank to begin with the first component in the file. |
|
Print the component listing |
Click Print. See Print. |
|
Display the previous set of records in the file |
Click Page up. |
|
Display the next set of records in the file |
Click Page down. |
|
Merge components from another project BOM or for an item in your database into this BOM |
Click Bill merge. See Merge Components from Another Bill of Material. |
|
Exit this bill of material |
Click Exit. The program prompts Parent item no and ECL. Enter the parent of a subassembly or leave blank to exit. |
-
Choose the appropriate options when you click OK or Cancel:
|
To |
Do This |
|
Add another subassembly |
Click Add. |
|
Delete the selected subassembly |
Click Delete. See Delete. |
|
Display the selected subassembly |
Click Select. |
|
Display items from a specific item |
Click Restart. The program prompts Parent item no and ECL. Enter the first item you want to display or leave blank to begin with the first component in the file. |
|
Print the item listing |
Click Print. See Print. |
|
Display the previous set of records in the file |
Click Page up. |
|
Display the next set of records in the file |
Click Page down. |
|
Sort the item listing |
Click Sort options. Click a sort option or click Cancel to use the original sort order. |
|
Exit this bill of material |
Click Exit. |
-
Choose the appropriate options when you click Exit:
|
To |
Do This |
||||||||||
|
Change a field |
Click Modify. |
||||||||||
|
Delete this project |
Click Delete. The program prompts Do you want to delete this record?. Click Delete to delete this entire project or click No to retain this project. |
||||||||||
|
Exit without creating this project |
Click Cancel. |
||||||||||
|
Display additional field |
Click Other info. |
||||||||||
|
Enter notes for this project |
Click Notes. See Enter Notes. |
||||||||||
|
Enter an item, its branch information, and costs |
Click Inventory and then:
|
||||||||||
|
Enter quantities, profit, commission, and discount percents |
Click Proj qtys. See Enter a Project Quantity. |
||||||||||
|
Enter a bill of material |
Click BOM. See Enter a Project Bill of Material. |
||||||||||
|
Enter a routing |
Click Routing. See Enter a Routing. |
||||||||||
|
Enter a new customer |
Click Customer. See Enter a New Customer. This button displays only if you entered a new customer in the Customer number field. |
||||||||||
|
Enter miscellaneous costs |
Click Misc costs. See Enter Miscellaneous Costs. |
||||||||||
|
Calculate costs for project quantities |
Click Roll up. |
||||||||||
|
Display the project and unit costs for project quantities |
Click Summary. See Display a Project Summary. |
||||||||||
|
Print documents for this project |
Click Print and then:
|
||||||||||
|
Transfer this project to your database |
Click Transfer. See Transfer a Project. |
||||||||||
|
Close this project |
Click Close proj. See Close a Project. |
||||||||||
|
Display the sales quote generated by this project or the sales order line if the sales quote has been transferred |
Click Order. See Enter a Sales Quotation or Display a Summarized Sales Order. This button displays only for a transferred customer project. |
||||||||||
|
Accept the data and exit |
Click OK. |
-
When you click OK or Cancel, enter another project number or exit the program.