Enter a Purchase Order Line
When you click OK when you enter a new PO or click Lines in the PO Maintenance (VOE) program, you can enter and change lines for the items you want to order. If the order has no lines, look ahead to step 2.
Previously entered PO lines are displayed:
Field Name |
Displays |
Ln |
The PO line number |
Non-stk? |
A check mark indicates the item ordered is not stocked |
Sts |
The status of the PO line |
Item no |
The item number ordered |
Description |
The item description |
M/L |
The material/labor
code: |
Date prom |
The date the vendor promised to deliver |
Pur qty ord |
The quantity of the purchase order in the purchasing unit of measure |
Extended amount |
The total cost
of the item on this line: |
Unit cost |
The cost for one unit |
Insp? |
A check mark indicates the item requires inspection |
Verified? |
A check mark indicates the vendor agreed to a changed promise date; blank indicates the promise date has not been changed or the vendor has not agreed to a changed date |
Choose the appropriate option:
To |
Do This |
Add a PO line |
Click Add. See step 2. |
Delete a PO line |
Highlight
the line and click Delete.
See Delete. |
Display a PO line |
Highlight the line and click Select or double click the line. See step 5. |
Print the list of PO lines |
Click Print. See Print. |
Display the extended and net amount totals for the PO |
Click Totals. Click OK to remove this data from display. |
Change the Date wanted or Date promised fields for multiple lines |
Click Adj dates. See Adjust Purchase Order Line Dates. |
Return to the PO header |
Click OK. See Enter A Purchase Order. |
Enter or change data in these fields:
Field Name |
Type / Max Length |
Action / Description |
Item number |
Conditional |
|
Req number |
Conditional |
If you did not enter an item number:
The program displays the branch, requisition number, item number, description, quantity, vendor number, vendor item number, and suggested price and prompts Continue with req to create PO line? If the requisition is for a different vendor, Vendor [no] for req doesn't match vendor for PO header; continue with req to create PO line? If the requisition is unassigned, Requisition does not have vendor. Continue with this requisition?
|
Material/Labor |
Required |
Select M to order material or L to order labor (a purchased outside service). |
Mfg branch |
Required |
Accept the displayed manufacturing branch or select a different manufacturing branch to which you have access. |
Mfg order no |
Conditional |
Enter the manufacturing
order number or click the Lookup
icon and use the standard lookup options
to select the order from a list if you want to add the cost of
this purchase to the cost of the manufacturing order or leave
blank if you do not. Note |
Part designator |
Conditional/Optional |
Enter the identifier your company uses if this component is listed on this bill of material more than once. You may call this designator a balloon number, bubble number, file number, material tag, or reference number. |
Operation seq no |
Conditional |
If
you entered a manufacturing order, enter the operation sequence
number when this service or labor is needed. |
Click Other info.
(Conditional) Select a unit price and minimum order quantity and click Select if you entered price breaks in the Vendor Price Maintenance (VMM) program for this item and vendor. Displayed prices are in the vendor's currency.
If you entered a requisition number and select a minimum order quantity, the Pur qty ordered is:
Pur qty ordered is |
If requisition quantity is |
Example |
Requisition quantity |
Larger than the selected price break |
Requisition quantity is 25 and minimum order quantity is 10, Pur qty order is 25. |
Minimum order quantity |
Smaller than the selected price break |
Requisition quantity is 25 and minimum order quantity is 100, Pur qty order is 100. |
OR
Click Exit to enter a different
quantity and price or to use the requisition quantity.
If the price break you select differs from the Suggested cost on the requisition, the program prompts Do you want to override vendor price? Click Yes to use the cost and quantity from the requisition or click No to use the selected price and quantity.
Field Name |
Type / Max Length |
Action / Description |
Pur qty ordered |
Required |
Accept the quantity or enter the quantity you want to order. If you enter a quantity that is less than the minimum order quantity set in Branch Item Maintenance (IMB), the program, the program prompts Entered quantity of [qty] is less than the MFG minimum order quantity of [qty] at the stocking unit of measure [UOM]; continue? Click Yes to continue or click No to increase the quantity. |
Unit cost |
Required |
Leave blank to
use vendor pricing in the Vendor Price Maintenance
(VMM) program. If there is no vendor pricing available, the program
uses costs set up in the Item Cost
Maintenance (ICM) program. Pricing populates the field when
you press F10. If your entry:
If there is no vendor pricing or unit cost set up for this item, enter the cost in the vendor's currency. Negative
Unit Cost Note |
Standard cost |
Display |
The standard cost of the item |
Extended amount |
Display |
The total cost for this line item: Pur qty ordered x Unit cost |
Vendor LT |
Display |
If you selected a vendor price record, the Vendor LT (specified in Vendor Price Maintenance) is displayed. If you do not use a vendor price record, the item's calculated lead time is displayed. |
Date wanted |
Required |
Select the date
you want this item to be delivered, enter a date
shortcut, or accept the default date. |
Date promised |
Required |
Select a date the vendor promised delivery, enter a date shortcut, or leave blank to use the Date wanted date. If you entered a manufacturing order number, when you click OK the program sets this date and the Due date in stk to: Mfg order due date - Item lead time, using the shop calendar. If you change the date promised, you can specify whether vendor delivery performance should be based on the new date (i.e., you requested the change) or the first promise date (i.e., the vendor's schedule slipped). |
Due date in stk |
Display |
The date the item is due to be in on-hand inventory: Date promised + Put away LT from the item's record in the Branch Item Maintenance (IMB) program If you entered a Mfg order no: Order due date - Mfg lead time for the parent or today if that date has passed |
First promise dt |
Display | The date on which vendor delivery performance is based |
AP clear dt |
Display |
The date the PO line was cleared through accounts payable |
GL org code |
Conditional |
Accept the displayed
general ledger organization code or select a different code. |
GL account no |
Conditional |
Accept the displayed
general ledger account number, enter a different account number,
or click the Lookup icon
and use the standard lookup options
to select the account from a list. |
Taxable? |
Optional |
Select if this item is subject to tax or leave blank if it is not. |
Inspection? |
Optional |
Select if this
item should be inspected or leave blank if it does not require
inspection. |
Rcv crt reqd? |
Display |
Whether or not
a receiving certificate is required; from the item's record in
the Enterprise Item Maintenance
(IM) program: |
Stocking UOM |
Display |
The unit of measure in which the item is stocked; from the item's record in the Enterprise Item Maintenance (IM) program |
Purchasing UOM |
Required |
Accept the displayed
purchasing unit of measure or select a different UOM. |
UOM conversion |
Display |
The factor used to convert from purchasing to stocking units of measure; from the item and vendor record in the Vendor Price Maintenance (VMM) program |
ECL |
Optional |
Accept the displayed
engineering change level or enter the ECL for the bill of material
for this item. |
Product class |
Optional |
Accept the displayed
product class or select a different product class. |
Eng drawing no |
Optional |
Accept or enter the displayed engineering drawing number. The program defaults to the drawing number entered in the bill of material header file. If there is no bill of material engineering drawing, the one specified in Branch Item Maintenance (IMB) is used. The field can be optionally printed on the purchase order document. |
Non-stock? |
Display | If selected, the ordered item is does not have an inventory record (maintained in the Enterprise Item Maintenance (IM) program) |
Description |
Conditional |
Accept the displayed
item description or enter a different description. You must enter
a description for a non-stock item. |
Vendor item no |
Optional |
Accept the displayed
vendor item number or enter a different number that identifies
this item to the vendor. |
Deliver to |
Optional |
Enter the person or department that this item is to be delivered to when it is received. |
Requested by |
Optional |
Enter the person or department that requested the item. |
Notify rcpt |
Optional |
Enter the user
ID of the person you want to notify when you receive this item
or click the Lookup icon and use the standard
lookup options to select the user from a list. |
Manufacturer |
Display |
The manufacturer of this item (maintained in Compliant Items by Manufacturer). |
Mfr part number |
Optional |
Select the manufacturer's part number for this item. |
Req number |
Display |
The requisition number you released in the Requisition Maintenance (IRM) program to create this PO or the requisition number referenced with the PO line was entered |
Material/Labor |
Display |
M:
This item is material |
Mfg branch |
Display |
The manufacturing branch |
Mfg order no |
Display |
The manufacturing or sales order that generated demand for this item |
Part designator |
Display |
The identifier your company uses to distinguish multiple occurrences of a component in the same bill of material. |
Operation seq no |
Display |
The number of the operation that identifies the point in the manufacturing process at which this component is needed |
Reason for chg |
Conditional |
If you changed the promised date, select a reason for the change. Reason codes and descriptions are maintained in Reason Codes Maintenance. |
Date adjusted by |
Display |
Blank unless the Date promised is changed after the line was entered. I User indicates that the user initiated the last date change; V Vendor indicates that the vendor initiated it. User-initiated promised date changes do not impact vendor delivery performance. |
Verified by vend |
Optional |
Select if the vendor has agreed to the changed promise date. |
The program displays these fields for the PO line:
Field Name |
Displays |
Original qty |
The original quantity ordered in the stocking unit of measure |
Qty received |
The quantity received into the branch in the stocking unit of measure |
Qty rejected |
The quantity that did not pass inspection in the stocking unit of measure |
Qty rcvd to stk |
The quantity placed in inventory in the stocking unit of measure |
Orig purch qty |
The entry in the Pur qty ordered field when this PO line was entered in the purchasing unit of measure |
Pur qty rcvd |
The quantity received in the purchasing unit of measure |
Pur qty rej |
The quantity rejected in the purchasing unit of measure |
Pur rcvd to stk |
The quantity received to stock in the purchasing unit of measure |
To |
Do This |
Display changes made to this PO line |
Click Audit. See Display
an Audit Trail. Click OK
to return to this program. |
Copy a PO line to one or more lines or split a PO line into two lines |
Click Copy/Blanket and then click Blanket (not available for labor PO lines) or Split line. |
Calculate the unit cost by entering an extended amount and purchase quantity |
Click Ext amt. 1. Enter the Extended amount. |
Display previous POs for this item from this vendor |
Click View BVBI. See Display Received POs for a Vendor by Item. Click OK to return to this program. |
Display pricing for this item |
Click Pricing. See Select
a Quantity and Price. |
Display the receiver for this purchase order line |
Click Receiver. See Display Receivers for Orders. Click OK to return to this program. |
Display calculated surcharges for this item from this vendor |
Click Surcharges. See Display PO Line Surcharges. |
Enter or display the demand order for this purchase order line |
Click Demand. If demand is from a sales order or if there have been receipts against the PO line, additional information is displayed. See Display a Summarized Sales Order or Display Components on a Manufacturing Order. Click OK to return to this program. If no manufacturing order is specified for PO line, the program allows you to enter one. The program displays the demand order type (i.e., MFG), the manufacturing branch and prompts Mfg order no. Enter an order number and click OK or click Cancel to leave the manufacturing order reference unchanged. If a manufacturing order number is specified for a material purchase and no receipts have been made against the PO line, the program displays the demand order type (i.e., MFG), the manufacturing branch, and the manufacturing order number:
|
Display a pending ECO for this item |
Click ECO. Press F1 to display the help topic, Display Engineering Change Orders by Item. |
Accept the data |
Click OK. The program prompts you to enter another line. Leave the fields blank to exit. |
Exit without completing this line |
Click Cancel. |
Update the record |
Click Apply. |
Delete a saved record |
Click Delete. |
Enter notes for this line |
Click Notes. See Enter Notes. |
Enter data in custom fields your company uses |
Click User. See Enter Data in User or Shadow File Fields. This button displays only if you have set up user-defined fields for this program in the User Fields Maintenance (XMO) program. |
Go to a related program |
Click Jump. See Jump. |
Change the line number |
Click Change no. This button is available only before you click OK when you are adding a new PO line. |
Void or close this line |
Click Close line. See Close a Purchase Order Line. |
Change a non-stock item number |
Click Item number. |
Display the item return detail |
Click Detail. See Display Returned Inventory Detail. This button displays only if this PO was generated when you selected a Return to Vendor disposition in the Rejected Material Disposition (MRB) program. |